Installing hardwood floors

We shall deliver the wood at a time convenient a minimum of two weeks before the start date in order for the wood to acclimatise to the conditions of the premises, preferably stored in the area where it is to be laid.

Any work needed to be done to the sub floor would be done in the two week period before the start date.

The floor will then be installed according to the clients specification and skirting fixed (if required), if it is a pre-finished floor the job will be complete. For un-finished flooring see resurfacing.

To find out more just give us a call or use our online enquiry form.

Design Agency Cambridge